Stowe Mountain Resort

  • J.A. McDonald, Inc. completed five projects, over a two time period, for Stowe Mountain Resort. These projects included the Phase I Infrastructure construction for Spruce Peak Residential, a 25 acre - 111 million gallon - 57 feet deep, snow-making / golf course irrigation pond, reconstruction and lining of the existing snow-making pond, the re-alignment and alteration of Spruce Brook, and the mass excavation and site work for the new Spruce Peak Hotel and Base Lodge.

 

 

 

 

 

 

Project Highlights:

625,000 cubic yards of excavation.

25,000 cubic yards of rock excavation.

35,000 linear feet of utility and drainage lines.

Construction of a 75 foot wood truss bridge.

Extensive utilization of GPS layout and GPS controlled equipment.

 

 


Project Challenges:

Mountainous Terrain:   Work was performed at elevations ranging from 1600 - 2100 feet in elevation.

Erosion Control:      Due to the Projects numerous streams, brooks, and identified and erosion control program was extensive and fluid, requiring J.A.McDonald, Inc. to have full time onsite design, coordination, and implementation capabilities.

Schedule:      Due to J.A.McDonald, Inc.'s experience and innovation, these projects were successfully, on-time, on budget, and without any environmental permit issues.

 