Lincoln Bridge Project

Lincoln Bridge Project was a Vermont State AOT project. The Project was part of the states Accelerated Bridge Construction Project (ABC). The project details were to remove the 128'  super-structure, demolish and remove the pier, and replace with cast in place footings, precast abutments, precast box beams and a 5" deck overlay. The challenge was the cast in place footings needing to marry up with the splice sleeve coupler's that were formed into the precast abutment. The 50 day window allowed for no room for error. The project was complete on time and opened to local traffic before school started in the fall.